The Development
The 75 turbine Willatook Wind Farm is located to the northwest of Warrnambool on a site cleared for livestock farming. The project is currently undergoing the EES process.
Our Work
Ratio’s transport team is assisting Wind Prospect Australia with strategic transport advice, preparing a transport engineering assessment as part of the current EES process.
A critical focus was given to the project construction phase, acknowledging that project generated traffic will be the major traffic component on local and arterial roads in the area.
Our assessment also included the identification of a preferred Western Truck group (WTG) component haulage route from the Port of Portland with interim works required to support over-size and over-mass vehicles.
Our team undertook a collaborative approach with Moyne Shire Council and the Department of Transport to formulate a successful traffic management and mitigation responses.